Activity
From 04/30/2011 to 05/29/2011
05/09/2011
05/05/2011
- 12:13 PM Feature #110 (Closed): [pre-rollout] prepare data & tools for load test
- prepare the following items which are needed by load test:
* list of performance metrics, e.g. expected time, time t... - 11:40 AM Feature #108 (Closed): [pre-rollout] [production] clone USA db
- clone the USA database.
update shopper table to point all email to a dummy email address - 11:39 AM Feature #107 (Closed): [pre-rollout] [production] clone US mall application
- clone the US mall application which needed for load test or UAT
- 11:35 AM Feature #106 (Closed): [pre-rollout] [production] duplicate STORE db schema
- duplicate the *STORE* database schema and export the data which needed for load test