Project

General

Profile

Activity

From 11/15/2010 to 12/14/2010

11/22/2010

02:43 PM MAXCONNECT Integration Feature #42 (Closed): customize the outgoing email
maxconnect will not send out email chin-yeh
02:43 PM MAXCONNECT Integration Feature #40 (Closed): conduct the integration test
chin-yeh
02:41 PM MAXCONNECT Integration Feature #40 (Resolved): conduct the integration test
refer to the attachment for the test result chin-yeh
02:39 PM MAXCONNECT Integration Feature #39 (Closed): integrate the module with NZ mall
chin-yeh

11/18/2010

09:31 AM MAXCONNECT Integration Feature #39: integrate the module with NZ mall
the back button cannot be removed according to satoru.
chin-yeh
 

Also available in: Atom