Project

General

Profile

Activity

From 12/02/2010 to 12/31/2010

12/03/2010

02:52 PM POC - Prototype Feature #48: perform load test on the fully integrated system
Change the policy from *BLOCK* to *DROP* when reach the maximum size of message in a queue. If maximum size is reache... chin-yeh
10:04 AM POC - Prototype Feature #48: perform load test on the fully integrated system
Based on discussion, while queue pool is full (during peak time) till not able to accept any new incoming request, in... Chooi-Mey

12/02/2010

05:00 PM POC - Prototype Feature #48 (Feedback): perform load test on the fully integrated system
The test result can be found in
> http://192.168.2.13:50000/redmine/projects/messaging-system/wiki/Load_Test_Integrated
chin-yeh
 

Also available in: Atom