Activity
From 10/10/2010 to 11/08/2010
10/29/2010
- 06:00 PM POC - Prototype 1:00 hour (Feature #43 (Closed): prepare the installation and administration guides)
- 05:18 PM POC - Prototype 6:00 hours (Feature #43 (Closed): prepare the installation and administration guides)
10/27/2010
- 06:26 PM POC - Prototype 3:00 hours (Feature #43 (Closed): prepare the installation and administration guides)
- 02:11 PM POC - Prototype 3:00 hours (Feature #44 (Closed): separate the application properties)
- 02:10 PM POC - Prototype 3:00 hours (Feature #45 (Closed): configure the application logging)
10/26/2010
- 04:30 PM POC - Prototype 5:00 hours (Feature #34 (Closed): develop the integration test)
10/19/2010
- 08:56 AM POC - Prototype 8:00 hours (Feature #33 (Closed): develop a callback to receive synchronzation status)
10/13/2010
- 07:02 PM POC - Prototype 4:00 hours (Feature #34 (Closed): develop the integration test)
Also available in: Atom