Activity
From 09/30/2010 to 10/29/2010
10/29/2010
- 06:04 PM The first draft of the documentation
- this project documentation's URL
> [[QConnector:Documentation]] - 06:01 PM POC - Prototype Feature #43: prepare the installation and administration guides
- the URL of the documentation
> [[QConnector:Documentation]] - 06:00 PM POC - Prototype Feature #43 (Resolved): prepare the installation and administration guides
- please check if you have anything want to put in
10/28/2010
- listener to capture the sync status
10/27/2010
- 03:54 PM POC - Prototype Application properties
- There is a separate module in SVN which stores all of the application properties.
> http://192.168.2.13:50000/svn/qc... - 02:11 PM POC - Prototype Feature #44 (Closed): separate the application properties
- 11:15 AM POC - Prototype Feature #44 (Closed): separate the application properties
- move the application properties files out of the archive file (WAR) to make it more easier to maintain in the future
- 02:10 PM POC - Prototype Feature #45 (Closed): configure the application logging
- 11:17 AM POC - Prototype Feature #45 (Closed): configure the application logging
- all of the logging files will be logged to JBOSS profile's log folder.
- 11:15 AM POC - Prototype Feature #34 (Closed): develop the integration test
10/26/2010
- 04:34 PM POC - Prototype Feature #43 (Closed): prepare the installation and administration guides
- * how to deploy various components
* how to monitor the various components
* how to change the common properties, e... - 04:30 PM POC - Prototype Feature #34 (Resolved): develop the integration test
- see wiki for the guide of integration test
10/20/2010
- 09:13 AM POC - Prototype Feature #34 (Feedback): develop the integration test
10/19/2010
- 09:17 AM POC - Prototype Feature #34: develop the integration test
- test the scenarios:
- if could not reach the web service
- reach the web service but encounter fault(soap) exception - the XML marshaller and unmarshaller
- the callback interface to update sync status
- 08:56 AM POC - Prototype Feature #33 (Closed): develop a callback to receive synchronzation status
10/12/2010
- 09:34 AM POC - Prototype Feature #34 (In Progress): develop the integration test
10/11/2010
- 02:34 PM POC - Prototype Feature #36 (Closed): Dot Com Adaptor
- Building Dot Com Adaptor for registration data sync module, in ibatis framework.
Development completed. Pending SIT... - 02:32 PM POC - Prototype Feature #9: Dot Com Web Services
- Pending Integration Testing.
10/08/2010
- soap adaptor
- ecosway adaptor
10/05/2010
- 05:34 PM POC - Prototype Feature #31 (Closed): integrate queue system with web service provider
10/04/2010
- 03:20 PM POC - Prototype Feature #32 (Closed): develop DAO for event table
10/01/2010
- 05:04 PM POC - Prototype Feature #31 (In Progress): integrate queue system with web service provider
- 05:02 PM POC - Prototype Feature #30 (Closed): build OXM utility
- checkout the trunk from http://192.168.2.13:50000/svn/commons/trunk
- 11:03 AM POC - Prototype Feature #35 (Closed): conduct integration test
- this integration test assumes that the following items are ready:
* ecosway adaptor
* jms adaptor
* web service - 10:59 AM POC - Prototype Feature #34 (Closed): develop the integration test
- build an automated integration test for the integrated components
- 10:43 AM POC - Prototype Feature #33 (Closed): develop a callback to receive synchronzation status
- the status will be updated to event table
- 10:41 AM POC - Prototype Feature #32 (Closed): develop DAO for event table
- develop a DAO for the event table which provides:
* insert
* update
* delete
* retrieve
09/30/2010
- 04:56 PM POC - Prototype Feature #31 (Closed): integrate queue system with web service provider
- 04:54 PM POC - Prototype Feature #30 (Closed): build OXM utility
- the utility will be used to serialize object to or from an XML.
- 03:42 PM POC - Prototype Feature #26 (Closed): perform load test
- Load test script (jmeter)
- Web Service Mimic for Jboss 5
Also available in: Atom