Activity
From 08/23/2010 to 09/21/2010
09/21/2010
- 04:48 PM POC - Prototype Feature #29 (Closed): build dummy web services
- 11:30 AM POC - Prototype Feature #29 (In Progress): build dummy web services
- 11:26 AM POC - Prototype Feature #29 (Closed): build dummy web services
- act as the dummy web service which receives request from JMS system.
- JMS adaptor
- 11:24 AM POC - Prototype Feature #28 (Closed): build the mimic web service
- The mimic web service is act as a proxy and all of request will actually store in the JMS system.
In order to mak... - 11:19 AM POC - Prototype Feature #27 (Closed): integrate the JMS, Web Service, Adaptor
- the dot com adaptor might not included as the component is yet to be developed.
- 11:16 AM POC - Prototype Feature #26 (Closed): perform load test
- suggest the following load test:
* average message sent per second
* average message consumed per second
* maximum... - 11:13 AM POC - Prototype Feature #7 (In Progress): develop the soap adaptor
- 11:11 AM POC - Prototype Feature #8 (Closed): develop the jms adaptor
- 11:03 AM POC - Prototype Feature #8: develop the jms adaptor
- this adaptor consists of 2 components:
* message producer
* message consumer in listening mode
09/13/2010
- 12:15 PM POC - Prototype Feature #8 (In Progress): develop the jms adaptor
09/02/2010
- Revision PA2 - Revised the prototype timeline.
08/24/2010
- 12:24 PM Support #5 (Closed): prepare the test environment for the team
- refer to [[QConnector:]] and [[General Info:cwyrnd3-server]] for more info.
- 12:15 PM How to access to the development environment
- The main development environment is set up on @cwyrnd3-server@.
* Refer to shared drive (src) to get the server lo...
08/23/2010
- 07:33 PM Support #10 (Closed): create backup plan
- see [[Backup Strategies]] for the details
- 04:43 PM Support #10 (Closed): create backup plan
- suggested features:
* perform daily backup
* backup application and its settings, e.g. Jboss
* backup data files, ... - 12:36 PM Feature #2 (Closed): configure the hornetq
installed in...- 09:44 AM Feature #2 (In Progress): configure the hornetq
- 09:50 AM POC - Prototype Feature #9 (Closed): Dot Com Web Services
- Build web services interfaces for Dot Com Adaptor.
- 09:46 AM Document: Project Plan
- Initial Project Plan. To be revised after prototype complete develop and tested.
- 09:21 AM Document: Activity Diagram
- Describes the activity flow of the system.
Also available in: Atom