Project

General

Profile

Activity

From 09/24/2010 to 10/23/2010

10/21/2010

08:03 PM Feature #39 (Feedback): integrate the module with NZ mall
Need to bring the new zealand database up to move on chin-yeh
06:48 PM Feature #39 (In Progress): integrate the module with NZ mall
chin-yeh
08:02 PM Feature #38 (Resolved): develop a service facade
will test the order status update once the new zealand databse is configured. chin-yeh
06:48 PM Feature #38: develop a service facade
Integrating with NZ mall chin-yeh
09:56 AM Support #41 (Closed): Set up the payment callback
the URL:
Kick System: http://219.94.77.229/nzstore/nz/mc_back_url_nz.jsp
Return button:http://219.94.77.229/nzstore...
chin-yeh

10/20/2010

05:02 PM Support #41 (Closed): Set up the payment callback
* check with hann about the URL for the payment receipt.
* provide the callback URL and receipt URL to MAXCONNECT
chin-yeh
04:58 PM Support #37 (Closed): get the staging access
chin-yeh

10/19/2010

05:40 PM Feature #40 (Closed): conduct the integration test
integration test between:
- NZ mall
- MAXCONNECT
chin-yeh
05:39 PM Feature #39 (Closed): integrate the module with NZ mall
chin-yeh
05:35 PM Feature #38 (Closed): develop a service facade
the facade consists of:
* the method to generate payment data
* the method to capture the payment result
** the re...
chin-yeh
02:35 PM Support #37 (Closed): get the staging access
get the access to MAXCONNECT's staging environment chin-yeh
 

Also available in: Atom