Activity
From 07/02/2011 to 07/31/2011
07/29/2011
- 07:03 PM DP Client Feature #117: DP Client Interface
- The prototype is ready:
> http://192.168.2.66:8080/dp-test/index.html
Feel free to give any feedback. The documen... - 10:23 AM DP Client Feature #117: DP Client Interface
- Production URL: http://210.64.216.74:8080/Dp/dpservices.asmx?wsdl
- 12:04 PM eCosway Change Request Feature #104: [HK-CR-360] - Macau HSBC Bank File
- ok
- 11:56 AM eCosway Change Request Feature #104: [HK-CR-360] - Macau HSBC Bank File
- User has already verified the file with bank, so the Macau Bank Program can be deployed to production by latest 15th ...
07/27/2011
- 05:26 PM DP Client Feature #117 (In Progress): DP Client Interface
- 04:09 PM DP Client Feature #117: DP Client Interface
- Confirm fingerprint encryption to use HMacMd5 method with:
message (combination of) = CENTERCODE^MEMBERID^PIN^DP_AM... - 02:53 PM DP Client Feature #117: DP Client Interface
- Upload DP Batch File Format.xls, refer to column "Daily Recon Batch" for the data file format (fixed length).
Curren... - 10:13 AM DP Client Feature #117 (Closed): DP Client Interface
- Features:
Build a client Interface Call to DP Web Services (http://60.249.0.211:8080/DP/DPServices.asmx?wsdl):
#... - 12:26 PM eCosway Change Request Feature #111 (Closed): [UK-CR-024] - UK HSBC Bank File
07/25/2011
- 12:48 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Changes:
1) Remove the '-' from the member's BankBranchCode, as system will always append the '-' in during storing....
07/21/2011
- 03:53 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- program done and ready to deploy to production
- 02:42 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Deploy to production on 21/07/2011.
- 10:30 AM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- For Information Purpose Only:
Additional Notes for Operation:
1) BACS Processing day must be greater than upload ... - 09:50 AM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Changes: Add in generation criteria as below based on finance user request (as attached html mail):
1) Any amount ... - 03:10 PM POC - Prototype Feature #108 (Closed): [pre-rollout] [production] clone USA db
- 03:10 PM POC - Prototype Feature #107 (Closed): [pre-rollout] [production] clone US mall application
- 03:09 PM POC - Prototype Feature #106 (Closed): [pre-rollout] [production] duplicate STORE db schema
07/20/2011
- 03:59 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Changes :
1) Change the UHL1 record - BACS processing day field (pos 5-10) from current date to current date + n ...
07/19/2011
- 06:05 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Changes : Change the UHL1 record - BACS processing day field (pos 5-10) from *current date* to *current date + 1 day*...
07/18/2011
- 05:00 PM POC - Prototype Feature #110 (Closed): [pre-rollout] prepare data & tools for load test
- 11:15 AM MiGS - Payment Processor Feature #114 (Closed): develop the adapter to access the MiGS services
- 11:14 AM MiGS - Payment Processor Feature #114 (Resolved): develop the adapter to access the MiGS services
- 11:13 AM MiGS - Payment Processor Feature #116 (In Progress): integrate MiGS payment gateway into DotBiz mall
- targeted to launch after September
07/14/2011
- 05:42 PM MiGS - Payment Processor Feature #113 (Closed): apply test account from MiGS
- 05:37 PM MiGS - Payment Processor Feature #114 (Feedback): develop the adapter to access the MiGS services
- The test page: http://192.168.2.68/ecosway/migs-sample/migs_test.html
*How To Test:*
* There're 3 dummy orders in th...
07/13/2011
- 06:56 PM MiGS - Payment Processor Feature #114: develop the adapter to access the MiGS services
- integration with queryDR will be excluded.
By the way, all of the params from MIGS's response will be hash-ed acco...
07/12/2011
- 04:54 PM MiGS - Payment Processor Feature #113 (Resolved): apply test account from MiGS
- 10:32 AM MiGS - Payment Processor Feature #116: integrate MiGS payment gateway into DotBiz mall
- implement in HK & CN mall only
07/11/2011
- 05:34 PM MiGS - Payment Processor Feature #113: apply test account from MiGS
- the production MID is ready. The staging MID is still in the progress of setting up.
- 05:31 PM MiGS - Payment Processor Feature #114 (In Progress): develop the adapter to access the MiGS services
07/07/2011
- 03:14 PM MiGS - Payment Processor Feature #115 (Rejected): integrate MiGS payment gateway into DotCom mall
- not needed for international mall
- 03:05 PM MiGS - Payment Processor Feature #115: integrate MiGS payment gateway into DotCom mall
- This MIGS payment gateway is only apply on dot biz mall, but not dot com mall.
Only dot biz mall will need to have t... - 03:01 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- report generated.
pending revert data replaced.
waiting verification - 02:47 PM eCosway Change Request Feature #111: [UK-CR-024] - UK HSBC Bank File
- Kindly regenerate the test bank file by this week based on the clarified pending items info as attached excel sheet.
- 02:35 PM POC - Prototype Feature #110 (Resolved): [pre-rollout] prepare data & tools for load test
- Scripts for load test:
* queue system [jmeter] - attachment:loadtest-queue.jmx
* ecwyconnector [soapui] - attachment:...
07/06/2011
- 03:40 PM POC - Prototype Feature #110: [pre-rollout] prepare data & tools for load test
- See [[Qconnector:Integration_Test_Result|Test Result]]
Also available in: Atom