Activity
From 08/09/2010 to 09/07/2010
09/06/2010
- PA 3
09/02/2010
- 02:46 PM Service Monitoring System Document: Ecosway Fault Management
- attachment:eCosway_Fault_Management_Rev_PA3.doc
- Revision PA2 - Revised the prototype timeline.
08/23/2010
- 09:46 AM QConnector Document: Project Plan
- Initial Project Plan. To be revised after prototype complete develop and tested.
- 09:21 AM QConnector Document: Activity Diagram
- Describes the activity flow of the system.
08/20/2010
- 05:07 PM QConnector Document: QConnector Solution Design Architecture
- Describe the solution logical architecture, explain the requirement and description about the diagram.
Also available in: Atom